{"id":9059,"date":"2024-09-25T13:28:47","date_gmt":"2024-09-25T11:28:47","guid":{"rendered":"https:\/\/www.coralynne.co.za\/blog\/?p=9059"},"modified":"2024-09-27T13:33:32","modified_gmt":"2024-09-27T11:33:32","slug":"weg-geared-to-service-the-drc-mining-sector","status":"publish","type":"post","link":"https:\/\/www.coralynne.co.za\/blog\/weg-geared-to-service-the-drc-mining-sector\/","title":{"rendered":"WEG GEARED TO SERVICE THE DRC MINING SECTOR"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">For over 20 years, WEG has been a strategic supplier to the mining sector in the Democratic Republic of Congo. Its local South African manufacturing base has been central to reduced lead times, while a well-established distribution and service network has enhanced support capabilities and, ultimately, customer satisfaction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With a total mineral wealth estimated in the tens of trillions of dollars, the DRC is one of the most strategic mining markets for WEG. Armed with a diverse scope of products including low and high voltage electric motors, low and high voltage drives, power and distribution transformers, gensets and energy solutions, low and medium voltage switchgear, motor control centres (MCCs) and E-houses, WEG has had a longstanding presence in the DRC mining market. Thierry Kakese, WEG\u2019s regional manager \u2013 Central Africa, says the company operates through various links and channels in the DRC.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWhen it comes to capital projects, we work directly with EPCM and project houses to ensure our products and solutions are specified. On the operational side, we do establish a direct link with end users, mostly via our in-country partners. Our local representation in the DRC comprises distribution and service channels,\u201d explains Kakese.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-scaled.jpg\"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-768x1024.jpg\" alt=\"\" class=\"wp-image-9060\" style=\"width:340px;height:auto\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-768x1024.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-225x300.jpg 225w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-1152x1536.jpg 1152w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-1536x2048.jpg 1536w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-01-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Committed to the profitability of its customers, WEG continually invests in the development of innovative industrial electrical solutions. One of WEG\u2019s flagship product lines in the DRC is its premium IE3 and IE4 motors. The energy saving benefits of WEG\u2019s IE3 and IE4 motors have set them apart from competitors, addressing mines\u2019 quests to reduce energy consumption and lower operating costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Much of the WEG equipment for the DRC is manufactured in South Africa. The low voltage (LV) and high voltage (HV) MCCs, transformers, gensets, MV soft starters, LV variable speed drives (VSDs) and soft starter panels are all manufactured in Johannesburg, while some of the gensets come from the company\u2019s Cape Town facility. Given the importance of quality control in mining, these facilities are ISO 9001: 2015 certified and adhere to high quality procedures and standards. WEG also complies with the relevant International Electrotechnical Commission (IEC) standards for the various product groups.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The fact that manufacturing now takes place in Johannesburg, which is only 2 000 km away from most of the mining sites in the DRC, significantly shortens lead times compared to previously importing from WEG\u2019s overseas factories in Europe, Asia or the Americas.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-scaled.jpg\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"9063\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-1024x768.jpg\" alt=\"\" class=\"wp-image-9063\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-1024x768.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-300x225.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-768x576.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-1536x1152.jpg 1536w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-04-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-scaled.jpg\"><img decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"9061\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-768x1024.jpg\" alt=\"\" class=\"wp-image-9061\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-768x1024.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-225x300.jpg 225w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-1152x1536.jpg 1152w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-1536x2048.jpg 1536w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-02-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cTo enable efficient delivery of products, we place value on proper planning and understanding all the logistical dynamics while the products are in transit, especially considering they have to pass through various border points. The target has always been to deliver timeously as per agreed timeframes with our customers despite border and road challenges,\u201d says Kakese.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Delivering products and solutions in the DRC is not without its challenges, adds Kakese. The DRC probably has one of the most challenging transport infrastructure environments in Africa. In addition, most of the mines are located in remote areas, rendering road transportation difficult.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cTo address this challenge, we have over the years bolstered our local representation with service and distribution partners who carry sufficient stockholding and are the first line of support for customers in the DRC. In fact, we have recently added IPS Congo to our Value Added Reseller (VAR) network. IPS Congo is strategically located in Kolwezi, where the majority of mines in the DRC are based. On the service side of our network, we have added Lekasi-based AEMI, which services our range of LV motors,\u201d explains Kakese.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-scaled.jpg\"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-768x1024.jpg\" alt=\"\" class=\"wp-image-9064\" style=\"width:322px;height:auto\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-768x1024.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-225x300.jpg 225w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-1152x1536.jpg 1152w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-1536x2048.jpg 1536w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2024\/09\/DRC-PIC-05-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Another major challenge in the DRC is the lack of technical skills. To address this, WEG invests heavily in the development of its local partners through continuous training programmes.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Commenting on some of the success stories in the DRC, Kakese points out that WEG\u2019s MV VSDs and LV motors have, in the past decade, been specified for some of the major projects in the country. However, it is WEG\u2019s involvement with a major copper project that he believes is a major reference point.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWe supplied and commissioned several of our products for Phase 1 and Phase 2 of this major copper project and we are currently completing Phase 3,\u201d says Kakese. \u201cIn future, our plan is to gain more local presence in the DRC by establishing a strong sales and service network with the ability to support our entire product portfolio. These partners would be product- and area-focused to ensure our customers in the DRC experience the best possible support,\u201d concludes Kakese.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Through a direct link to end users, supported by a capable distribution and service network, WEG is geared to support mining customers in the Democratic Republic of Congo (DRC) and the Copperbelt region at large. The logistical benefits of sourcing equipment from its South African manufacturing base instead of from overseas factories ensures short lead times for mines operating in the region. <\/p>\n","protected":false},"author":2,"featured_media":9062,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-9059","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-client-focus"],"_links":{"self":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/9059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/comments?post=9059"}],"version-history":[{"count":1,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/9059\/revisions"}],"predecessor-version":[{"id":9065,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/9059\/revisions\/9065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/media\/9062"}],"wp:attachment":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/media?parent=9059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/categories?post=9059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/tags?post=9059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}