{"id":10821,"date":"2025-09-30T22:14:57","date_gmt":"2025-09-30T20:14:57","guid":{"rendered":"https:\/\/www.coralynne.co.za\/blog\/?p=10821"},"modified":"2025-11-12T22:17:23","modified_gmt":"2025-11-12T20:17:23","slug":"concors-wind-energy-gamechanger-full-bop-under-one-roof","status":"publish","type":"post","link":"https:\/\/www.coralynne.co.za\/blog\/concors-wind-energy-gamechanger-full-bop-under-one-roof\/","title":{"rendered":"CONCOR\u2019S WIND ENERGY GAMECHANGER : FULL BOP UNDER ONE ROOF"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In a milestone achievement for South Africa\u2019s renewable energy sector, Concor has taken full control of the Balance of Plant (BoP) scope on the TotalEnergies Renewables De Aar 2 South Wind Energy Facility in the Northern Cape. This marks the first time the company is delivering a fully wrapped BoP contract under its own direct engineering and construction management. Not only is Concor the main contractor for the 25 turbine project spread across five farms near Philipstown, but it is also responsible for both the Civil BoP (CBoP) and Electrical BoP (EBoP) &#8211; from design and engineering through to execution including the Eskom Distribution self-build scope. This comprehensive self-perform approach represents a bold departure from traditional contracting models and signals Concor\u2019s evolution into a truly turnkey BoP provider.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWith over 13 years of experience in renewable energy infrastructure, more than 10 wind farms successfully completed since 2012 and a further six wind farms currently in various phases of construction, Concor is no stranger to the demands of this sector,\u201d says Stephan Venter, Contract Director at Concor. \u201cBut this project sets a new benchmark. By taking full ownership of both the engineering and construction elements, we are reducing interfaces, improving accountability and de-risking the process for our clients.\u201d&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This strategic shift positions Concor at the forefront of renewable project delivery in South Africa, offering clients a streamlined single-source BoP solution that enhances coordination and ensures delivery certainty.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10829\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08-1024x683.jpg\" alt=\"\" class=\"wp-image-10829\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-08.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07.jpg\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"10828\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07-1024x768.jpg\" alt=\"\" class=\"wp-image-10828\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07-1024x768.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07-300x225.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07-768x576.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-07.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10827\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06-1024x683.jpg\" alt=\"\" class=\"wp-image-10827\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-06.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10826\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05-1024x683.jpg\" alt=\"\" class=\"wp-image-10826\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-05.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The 5,473 hectare facility is on a fast track programme, with early works launched in November 2024 and completion expected by Q3 of 2026. The company\u2019s scope includes 54 km of gravel road infrastructure, starting with the realignment and upgrading of 15 km of the existing Kranskop district road to accommodate heavy turbine components. Additionally, 41 km of new internal access roads are being constructed, supported by extensive blasting and cut-and-fill earthworks to adapt to the local terrain.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10822\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01-1024x683.jpg\" alt=\"\" class=\"wp-image-10822\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-01.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10823\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02-1024x683.jpg\" alt=\"\" class=\"wp-image-10823\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-02.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03.jpg\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"10824\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03-1024x768.jpg\" alt=\"\" class=\"wp-image-10824\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03-1024x768.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03-300x225.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03-768x576.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-03.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04.jpg\"><img decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"10825\" src=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04-1024x683.jpg\" alt=\"\" class=\"wp-image-10825\" srcset=\"https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04-1024x683.jpg 1024w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04-300x200.jpg 300w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04-768x512.jpg 768w, https:\/\/www.coralynne.co.za\/blog\/wp-content\/uploads\/2025\/11\/DE-AAR-PIC-04.jpg 1299w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A major innovation lies in Concor\u2019s design of the turbine foundations. A unique central pit, 7 metres in diameter and filled with G7 material, has been incorporated to address the region\u2019s geological challenges, reducing stress on the 22 metre diameter concrete bases. Each foundation uses 600 m\u00b3 of specially designed readymix concrete, batched on-site making use of two brand new modified 45 m<sup>3<\/sup>\/hr Karoo plants to ensure consistency and quality. Smart rock sensors embedded in the foundations monitor internal temperatures, allowing real-time adjustments to mitigate the risk of thermal cracking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the Electrical Balance of Plant (EBoP), Concor is responsible for trenching and laying 13km of 33kV medium voltage cabling from each turbine\u2019s Power Transformer Kiosk (PTK) to a termination overhead line (OHL) structure. This is linked via an extensive 80km 33kV OHL network to the IPP substation, which steps up the voltage to 132kV utilising a 165 MVA power transformer. The project also includes the construction of a new adjacent Eskom Distribution 132kV Switching Station (SWS) and an extension of a 132kV OHL to an upstream Eskom Main Transmission Substation (MTS).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has not been without challenges. A high water table impacted 11 of the 25 turbine bases, requiring the installation of subsoil drainage systems. In addition, heavy seasonal rainfall necessitated robust stormwater management to protect both access and internal roads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Environmental compliance has remained central to Concor\u2019s operations, guided by the Environmental Management Programme Report (EMPR). Teams receive regular training to uphold environmental protocols and safeguard heritage and biodiversity in this sensitive landscape.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cOur execution reflects Concor\u2019s depth of experience in remote, large-scale projects,\u201d says Concor Project Manager Gideon Niemand. \u201cWe are delivering to the highest standards, with environmental responsibility and engineering excellence at the core of everything we do.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through innovative engineering, efficient planning, and environmental stewardship, Concor is helping shape a more sustainable energy future &#8211; one turbine at a time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a milestone achievement for South Africa\u2019s renewable energy sector, Concor has taken full control of the Balance of Plant (BoP) scope on the TotalEnergies Renewables De Aar 2 South Wind Energy Facility in the Northern Cape. This marks the first time the company is delivering a fully wrapped BoP contract under its own direct &hellip; <a href=\"https:\/\/www.coralynne.co.za\/blog\/concors-wind-energy-gamechanger-full-bop-under-one-roof\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">CONCOR\u2019S WIND ENERGY GAMECHANGER : FULL BOP UNDER ONE ROOF<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":10830,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[147],"class_list":["post-10821","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-client-focus","tag-concor"],"_links":{"self":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/10821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/comments?post=10821"}],"version-history":[{"count":1,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/10821\/revisions"}],"predecessor-version":[{"id":10831,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/posts\/10821\/revisions\/10831"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/media\/10830"}],"wp:attachment":[{"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/media?parent=10821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/categories?post=10821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.coralynne.co.za\/blog\/wp-json\/wp\/v2\/tags?post=10821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}